AGENDA ITEM
Special Board Meeting
of
July 20, 2009
SUBJECT: Budget Update
FROM: David Niemeyer, Village Manager
BUDGET SOURCE/BUDGET IMPACT:
RECOMMENDED MOTION: To approve the Manager’s recommended reductions for
the 2009 budget and to approve the staffing reduction plan as recommended by the Village
Manager.
Background/History:
The board directed staff to develop $1.5 million in recurring, long term cuts at the June 15
meeting. In closed session on July 14th, staff presented a number of personnel cuts with various
dates when these positions would be eliminated. This includes making some positions currently
vacant into long term cuts. No additional cuts are assumed for the library until the consultant
complete their report. Also, we have developed additional cuts for the 2009 budget in addition to
the $1.3 million in budget reductions developed in March.
I have attached a revised worksheet showing the total savings from personnel reductions as a
result of recommendations. Included in this worksheet are 2 items that were given to the board
last week that were not eligible to be discussed in closed session. First, is requiring all 35 and
37.5 hours clerical positions to work 40 hours per week, effectively eliminating the straight time
overtime that they currently earn. This will save approximately $25,000 per year. Second, fire
department inspections will now be done on shift rather than special details, which will save
about $60,000 per year.
Below are the personnel reductions as recommended by the manager.
Last saved by dniemeyer C:\Documents and Settings\rkane\Local Settings\Temporary Internet Files\Content.Outlook\FKDDSQCV\AG-budget
update Spec Mtg 7-20-09.doc
Last printed 7/21/2009 5:20 PM
Library:
At this point, while we have asked our consultant to find $300,000 in permanent cuts to the
library, we have not yet received a report from the Board, so this cut is not included in the total.
Administration/Clerk/Finance Department:
Deputy Village Clerk: Eliminate effective August 1st. Annual Savings: $84,848.
Records Management Clerk: Eliminate effective October 1. Annual Savings: $70,839.
Receptionist: Effective August 1st.Annual savings: $51,305.
Finance Director – Position left open until January 1st, need to refill at that point.
2009 Savings: $80,000.
Water Billing Clerk-Eliminate effective November 1, transfer clerk from Sports Core to do work.
Savings is in Sports Core, not general fund.
Add 3 part time employees, minute taker. Annual cost: $49,485.
Information Technology
IT Tech II: Position eliminated effective June 30th
Annual savings: $108,088.
Add outsource or part time IT person. Annual savings: $50,000.
Police:
Eliminate 2 full time dispatchers. Effective October 1st.Annual savings: $131,052.
Eliminate 2 full time records position. Effective August 1. Annual savings: $118,566.
Make Community Service Officer vacancy long term cut. Annual Savings: $33,910.
Make other full time dispatcher vacancy long-term cut. Annual savings: $63,289.
Make other part time dispatcher vacancy long-term cut. Annual savings: $35,319.
Add part time records clerk. Annual cost: $29,460.
Add 2 part time dispatchers: $70,000.
Fire:
Make Deputy Chief vacancy long term cut. Annual savings: $160,136.
Make vacant 2 firefighters/paramedic positions long term cut. Annual savings: $178,000.
Last saved by dniemeyer C:\Documents and Settings\rkane\Local Settings\Temporary Internet Files\Content.Outlook\FKDDSQCV\AG-budget
update Spec Mtg 7-20-09.doc
Last printed 7/21/2009 5:20 PM
Do fire inspections on shift. Annual savings: $60,000.
Temporarily keep open 3rd Firefighter position for 3 months. 2009 Savings: $25,786.
Public Works/Engineering : (Infrastructure fund).
Eliminate Village Engineer position, combine public works/engineering department. Effective
October 1st. Also working with Community Development on combining permit process with
Community Development and Fire Dept. Annual Savings: $161,185.
(Water fund) Eliminate 1 public works employee effective February 1. Annual savings: $66,058.
Sports Core:
As shown on the attached worksheet, outsourcing of the B and T to Calihan Catering will save
the village $398,457 in personnel costs on an annual basis. Also one employee is being
transferred to the finance department. Also not shown on the sheet is the additional savings in
food supplies and other costs related to the operation of the clubhouse. However, this is also
offset by the fact that the village will still have approximately $100,000 in building, outside
maintenance related costs and debt service until 2012. Also, we will not receive 100% of the
revenue from B and T events but 10% of the food and beverage revenues plus a rental fee.
Our expectation at this point is that in the first year the Calihan contract will provide us with a
net increase in revenues compared to expenses of $50,000 compared to continuing to operate the
Clubhouse with village staff.
Changing all clerical hours to 40 hour work weeks. Annual estimated savings: $25,000.
In summary, I am recommending $1,778,954 in long term personnel related budget cuts to the
Village Board. However this is offset by additional costs for adding part timers and outsourcing
in IT and administration, which reduces the savings to $1,612,118. Also, to get the actual annual
budget savings, we must only include the projected increase in profit by outsourcing the
clubhouse, which is $50,000, rather than the total personnel cost savings related to outsourcing,
which is $321,405. Therefore, the actual annual budget savings from all of these cuts is
$1,275,702.
If the Board adopts my recommendation, we will be eliminating the full time equivalent (FTE) of
14.75 positions. (This does not include FTE reductions from the library study). We also
eliminated 6.5 positions beginning last August for a total of 21.25 positions in an 18 month
period. In July 2008 our total FTE’s were 180.75; in January 2010 the total would be 159.50
FTE’s under this proposal (excluding the Library).
Additional 2009 Budget Cuts
Attached is a worksheet with proposed cuts to reduce the 2009 budget. This includes $241,094 in
total training, capital and miscellaneous cuts and work force changes for 2009. However, this
includes several positions that were frozen in March, so the actual additional savings after
Last saved by dniemeyer C:\Documents and Settings\rkane\Local Settings\Temporary Internet Files\Content.Outlook\FKDDSQCV\AG-budget
update Spec Mtg 7-20-09.doc
Last printed 7/21/2009 5:20 PM
miscellaneous expenditure reductions and personnel reductions in 2009 is $220,325, as is shown
on the attached sheet.
I would like to thank Sharon, Blaine, Eileen, and all the Department Directors for all of their
extra effort on this plan.
Recommendation:
Motion to approve staffing reduction plan as recommended by the Village Manager as well as
$1,275,702 in additional reductions to the 2009 budget (excluding the Library).
CC: Blaine Wing, Sharon Dangles
Oak Brook Board of Trustees Meeting of July 14, 2009
Sunday, July 19, 2009
Citizen’s Finance Advisory Committee July 8, 2009
This was the first meeting of this new committee, consisting of Don Adler, George Klein, Norma Lauder, Todd Rusteberg, and Randall Teteak. The first order of business was to elect Don Adler Chairman. Chairman Adler reviewed the committee’s charge and assigned tasks to each member. All members will review actual income and expenses vs. budget. Adler and Klein will review employee compensation and benefits and the requirements of state law and union contracts. Adler and Lauder will review all sources of revenues. Rusteberg and Teteak will review information technology and garage operations. The committee will also review contracted services and non-governmental operation, e.g. Sports Core. Adler plans to report to the Village Board monthly. Next agenda item was resident comment. Connie Xinos of Briarwood provided copies of all village employees’ salaries and benefits, which he had obtained thru FOIA. He advocated a 15% staff reduction. He asked if this committee was willing to make hard decisions and recommendations to the Village Board. George Klein assured Mr. Xinos that the committee would be making difficult decisions and he personally was willing to close both the library and the B&T. Resident Mario Vescovi of Fullersburg advocated a 20% reduction of village payroll. Resident Al Knuth noted he had advocated canceling employee raises. Adler asked Village Manager Niemeyer to provide salary history for police and fire as well as non-union employees. Niemeyer noted that the Village had been in negotiations with both unions for over a year. The Village may face a significant payment for back pay since the end of the last contract if the new contract includes retroactive payment since the end of the old contract. Village Trustee Aktipis arrived late and asked committee members to serve at least through the end of this year, although their appointments are for two years. They set their next meeting for July 22 at 7PM. They asked Niemeyer to explain fund accounting, review the month by month budget vs actual income and expenses, and discuss garage operations and which employees were assigned Village cars for personal use. Niemeyer asked the committee to help look at big picture budget items and consider which Village services to reduce and by how much.
The Doings covered this meeting in the article at
http://www.pioneerlocal.com/oakbrook/news/1659497,oak-brook-layoffs-070909-s1.article